An air support structure without heating was erected. Size: 35x55x10.5 m.
An air support structure without heating was erected. Size: 35x55x10.5 m.
An air support structure without heating was erected. Size: 35x55x10.5 m.
An air support structure was erected with heating by a heat generator (Gas). Great Meadow District. Size: 28x48x10 m.
Size: 3x3x3 m.
An air support structure was erected above the tennis court. Heating with a heat generator (diesel fuel). Size: 18x36x9 m.
An air support structure with heating (gas heat generator) was erected. Size: 36x54x10.5 m.
Heating by a heat generator (hot water + electric). The air support structure is equipped with an air conditioning system. Size: 36x50x10.5 m.
An air-supporting structure without heating for the Polyus ice rink was erected in the city center. Size: 34x67x10.5 m.
In a short time, in the center of Kiev, on the territory of the Olympic Stadium, next to the Sports Palace, a dome of the Eurovision 2005 press center for 300 workplaces was installed, with a cooling system. Size 36x51x10 m.